Lighting Fixture Modification Project at Central Pattana, Hatyai

Lighting Fixture Modification Project at Central Pattana, Hatyai

Lighting Fixture Modification Project Around the Shopping Center



Owner:

Central Pattana (CPN), Hatyai


Scope of Work:

  • Site Inspection and Fixture Positioning

    Our team will conduct a site inspection and assess the positions of all the lighting fixtures that need to be modified to plan the work effectively.

 

  • Coordination with Relevant Personnel

    Coordinate with the relevant personnel to cut off the power supply while replacing the lighting fixtures to ensure safety.

 

  • Reassemble Fixtures in Original Positions

    After replacing the lighting fixtures, our team will reassemble them in their designated original positions.

 

  • Lighting System Testing

    Test the lighting system after the fixtures have been replaced to ensure they are working perfectly.

 

  • Site Cleaning

    Clean the work area after each work session to restore the site to its original condition.

 

  • Project Handover

    Hand over the project to the responsible personnel for inspection and confirmation of work completion.

 


At BCC, we are capable of handling various specifications and types of work. With our experience and expertise in installation and modification, our team is dedicated to providing the highest level of customer satisfaction.