Process Cooling Tower Installation TAKACHIHO

Process Cooling Tower Installation TAKACHIHO

Project Period: 1-31 Jul 2024
Site Location: TUI Site Samutsakhon

Process Cooling Tower Installation


Scope of work for the Process Cooling Water Pipe (CDWS, CDWR, EQ)


1. Design and Planning
  • Review and determine the routing of the Process Cooling Water Pipes (CDWS, CDWR, EQ) to optimize for production processes.
  • Design the piping system and select appropriate materials in accordance with engineering specifications and relevant standards.
  • Plan the installation and maintenance to ensure the system operates at peak efficiency.

2. Procurement and Material Supply
  • Source and supply pipes, valves, pumps, and related accessories according to technical specifications.
  • Inspect and control the quality of materials prior to installation.

3. Installation
  • Install cooling water pipes for chilled water supply and return (CDWS and CDWR), including associated components like valves, pumps, and pressure gauges.
  • Install control equipment and the Equalizing Line (EQ) system to ensure continuous and stable operation.

4. Testing and System Inspection
  • Conduct pressure tests on the piping system to ensure there are no leaks.
  • Inspect and adjust the EQ system to achieve pressure and temperature balance within the system.
  • Verify the overall performance of the system.

5. Maintenance and Support
  • Develop and execute preventive maintenance plans to extend the lifespan of the system.
  • Provide technical support and troubleshooting services in case of issues post-installation.

6. Handover
  • Prepare and deliver documentation such as As-built drawings, test reports, and operation manuals.
  • Train relevant personnel on proper system maintenance and operation.