Project Period: 1-31 Jul 2024
Site Location: TUI Site Samutsakhon
Process Cooling Tower Installation
Scope of work for the Process Cooling Water Pipe (CDWS, CDWR, EQ)
1. Design and Planning- Review and determine the routing of the Process Cooling Water Pipes (CDWS, CDWR, EQ) to optimize for production processes.
- Design the piping system and select appropriate materials in accordance with engineering specifications and relevant standards.
- Plan the installation and maintenance to ensure the system operates at peak efficiency.
2. Procurement and Material Supply- Source and supply pipes, valves, pumps, and related accessories according to technical specifications.
- Inspect and control the quality of materials prior to installation.
3. Installation- Install cooling water pipes for chilled water supply and return (CDWS and CDWR), including associated components like valves, pumps, and pressure gauges.
- Install control equipment and the Equalizing Line (EQ) system to ensure continuous and stable operation.
4. Testing and System Inspection- Conduct pressure tests on the piping system to ensure there are no leaks.
- Inspect and adjust the EQ system to achieve pressure and temperature balance within the system.
- Verify the overall performance of the system.
5. Maintenance and Support- Develop and execute preventive maintenance plans to extend the lifespan of the system.
- Provide technical support and troubleshooting services in case of issues post-installation.
6. Handover- Prepare and deliver documentation such as As-built drawings, test reports, and operation manuals.
- Train relevant personnel on proper system maintenance and operation.